Product Details
Technical Specifications
| Feature | Specification |
|---|---|
| Skid Dimensions | Customizable — up to 18m × 5m × 5m (L×W×H) per module |
| Skid Weight | Up to 200 tons per module (depending on equipment scope) |
| Design Codes | ASME B31.3 / B31.1, ASME Section VIII Div.1, PED 2014/68/EU, AISC 360 |
| Pressure Rating | PN16 ~ PN420 / ANSI Class 150 ~ 2500 |
| Temperature Range | -30°C to 150°C (depending on process media and material selection) |
| End Connections | Flanged (RF, RTJ), Butt-Weld (BW), Socket-Weld (SW) |
| Structural Material | Carbon Steel (A36 / S275), Stainless Steel (304 / 316), or Duplex as required |
| Surface Treatment | Sandblasting to Sa 2.5 + Epoxy primer / PU topcoat (or hot-dip galvanized) |
| Electrical & Instrumentation | IECEx / ATEX / NEC hazardous area classification; IP65/IP66 enclosure rating |
| Testing & Inspection | Hydrotest, Pneumatic Leak Test, NDE (RT/UT/MT/PT), FAT, Dimensional Inspection |
FAQ
Q1: What is a skid-mounted package, and how does it differ from traditional field-installed systems?
A: A skid-mounted package is a pre-assembled, pre-tested modular unit where all process equipment — valves, pipes, instruments, vessels, pumps, and controls — are mounted on a structural steel base frame (the “skid”) at the manufacturer’s workshop. The entire unit is then shipped to the job site as a single module for final connection and commissioning.
Key differences from traditional installation:
Shop-Fabricated: All welding, assembly, and testing are performed in a controlled factory environment, ensuring higher quality than field work.
Pre-Tested: Hydrostatic testing, functional testing, and loop checks are completed before shipment, reducing commissioning time on site.
Modular Design: Multiple skids can be fabricated in parallel, significantly shortening overall project schedules.
Q2: What are the main advantages of using skid-mounted packages?
A: The primary benefits include:
Reduced Field Work: Up to 80–90% of fabrication and testing is completed in the shop, minimizing on-site labor, welding, and scaffolding requirements.
Faster Project Delivery: Parallel fabrication of multiple skids and reduced field installation time can shorten project schedules by 30–50%.
Higher Quality Control: Factory conditions allow for better welding quality, NDE (non-destructive examination), and painting compared to open-field conditions.
Cost Predictability: Shop fabrication allows for more accurate cost estimation and reduces the risk of weather-related delays and field rework.
Easier Relocation: Skid-mounted units can be disconnected, lifted, and relocated to another site if process requirements change.
Q3: What types of equipment are typically included in a skid-mounted package?
A: A skid package is highly customizable, but typical components include:
Piping & Valves: Process piping, control valves, isolation valves, check valves, relief valves, and associated flanges/fittings.
Instruments: Pressure transmitters, temperature sensors, flow meters, level transmitters, control valves with positioners, and junction boxes.
Control System: Local control panel, PLC/RTU, HMI panel, and instrument air supply system.
Process Equipment: Separators, heat exchangers, pumps, compressors, filters, and metering skids.
Structural: Steel base frame, grating, handrails, ladders, and lifting lugs.
Q4: How is a skid-mounted package designed and engineered?
A: The design process typically follows these stages:
Process Design: P&ID development, heat and material balance, hydraulic calculations, and control philosophy.
Mechanical Design: 3D modeling of the skid layout, piping stress analysis, structural steel design, and equipment sizing.
Instrument & Electrical Design: Instrument index, cable schedule, I/O list, control logic, and hazardous area classification.
Fabrication & Assembly: Cutting, welding, NDE, hydrotesting, painting, and final assembly on the skid frame.
Factory Acceptance Test (FAT): Complete functional testing, loop checks, and leak testing before shipment.
Q5: What codes and standards apply to skid-mounted packages?
A: Skid packages must comply with multiple international codes depending on the application and destination country:
Piping: ASME B31.3 (Process Piping), ASME B31.1 (Power Piping).
Pressure Vessels: ASME Section VIII Div. 1, PED 2014/68/EU (Europe).
Structural Steel: AISC 360, EN 1090 (Europe).
Electrical & Instrumentation: IEC 60079 (Explosion Protection), NEC/IECEx for hazardous area classification.
Lifting & Transport: EN 12079 (Offshore Containers), ASME BTH-1 (Lifting Design).
Welding: ASME Section IX, ISO 15614, AWS D1.1.
Q6: What are the transportation and lifting considerations for skid packages?
A: Proper planning for transport and installation is critical:
Weight & Dimensions: Each skid must be designed within road/rail/sea transport limits. Oversized skids may require special permits, escort vehicles, or barge transport.
Center of Gravity: The skid’s center of gravity must be calculated and clearly marked. Lifting lugs must be positioned to ensure balanced lifting without tilting.
Lifting Plan: A detailed lifting plan must be prepared, specifying crane capacity, rigging configuration, wind speed limits, and exclusion zones.
Sea Fastening: For offshore or overseas shipments, the skid must be secured with welded sea fasteners or bolted restraints designed for marine transport accelerations.
Q7: What site preparation and commissioning steps are required after skid delivery?
A: After the skid arrives on site, the following steps are typically required:
Foundation Verification: Confirm that the concrete foundation or steel support structure matches the skid’s footprint, anchor bolt pattern, and elevation.
Setting & Leveling: Place the skid on the foundation, shim as needed, and verify levelness within specified tolerances (typically ±2 mm).
Utility Connections: Connect power supply, instrument air, cooling water, drain, and vent lines to the skid’s interface points.
Process Piping Tie-In: Connect the skid’s inlet and outlet piping to the main process piping system.
Pre-Commissioning: Flush piping, verify instrument calibration, check valve stroke and direction, and perform loop checks.
Commissioning & Start-Up: Introduce process media gradually, verify control system response, and tune control loops.
Site Acceptance Test (SAT): Final performance verification against the guaranteed process parameters before handover to the client.
Q8: What maintenance advantages do skid-mounted packages offer?
A: Skid-mounted packages simplify maintenance in several ways:
Accessibility: All equipment is mounted at ergonomic heights on an open frame, eliminating the need for scaffolding in most cases.
Modular Replacement: If a component fails, the entire sub-skid or cartridge can be unbolted, lifted out, and replaced with a spare — minimizing downtime.
Documentation: Each skid comes with a complete documentation package (as-built drawings, material certificates, test reports, spare parts list), making future maintenance planning straightforward.
Condition Monitoring: Modern skids can be equipped with vibration sensors, corrosion probes, and remote monitoring systems for predictive maintenance.