Skid-Mounted Systems

Technical Specifications Feature Specification Skid Dimensions Customizable — up to 18m × 5m × 5m (L×W×H) per module Skid Weight Up to 200 tons per module […]

Product Details

Technical Specifications

Feature Specification
Skid Dimensions Customizable — up to 18m × 5m × 5m (L×W×H) per module
Skid Weight Up to 200 tons per module (depending on equipment scope)
Design Codes ASME B31.3 / B31.1, ASME Section VIII Div.1, PED 2014/68/EU, AISC 360
Pressure Rating PN16 ~ PN420 / ANSI Class 150 ~ 2500
Temperature Range -30°C to 150°C (depending on process media and material selection)
End Connections Flanged (RF, RTJ), Butt-Weld (BW), Socket-Weld (SW)
Structural Material Carbon Steel (A36 / S275), Stainless Steel (304 / 316), or Duplex as required
Surface Treatment Sandblasting to Sa 2.5 + Epoxy primer / PU topcoat (or hot-dip galvanized)
Electrical & Instrumentation IECEx / ATEX / NEC hazardous area classification; IP65/IP66 enclosure rating
Testing & Inspection Hydrotest, Pneumatic Leak Test, NDE (RT/UT/MT/PT), FAT, Dimensional Inspection

 

FAQ

Q1: What is a skid-mounted package, and how does it differ from traditional field-installed systems?

A: A skid-mounted package is a pre-assembled, pre-tested modular unit where all process equipment — valves, pipes, instruments, vessels, pumps, and controls — are mounted on a structural steel base frame (the “skid”) at the manufacturer’s workshop. The entire unit is then shipped to the job site as a single module for final connection and commissioning.

Key differences from traditional installation:

Shop-Fabricated: All welding, assembly, and testing are performed in a controlled factory environment, ensuring higher quality than field work.
Pre-Tested: Hydrostatic testing, functional testing, and loop checks are completed before shipment, reducing commissioning time on site.
Modular Design: Multiple skids can be fabricated in parallel, significantly shortening overall project schedules.

Q2: What are the main advantages of using skid-mounted packages?

A: The primary benefits include:

Reduced Field Work: Up to 80–90% of fabrication and testing is completed in the shop, minimizing on-site labor, welding, and scaffolding requirements.
Faster Project Delivery: Parallel fabrication of multiple skids and reduced field installation time can shorten project schedules by 30–50%.
Higher Quality Control: Factory conditions allow for better welding quality, NDE (non-destructive examination), and painting compared to open-field conditions.
Cost Predictability: Shop fabrication allows for more accurate cost estimation and reduces the risk of weather-related delays and field rework.
Easier Relocation: Skid-mounted units can be disconnected, lifted, and relocated to another site if process requirements change.

Q3: What types of equipment are typically included in a skid-mounted package?

A: A skid package is highly customizable, but typical components include:

Piping & Valves: Process piping, control valves, isolation valves, check valves, relief valves, and associated flanges/fittings.
Instruments: Pressure transmitters, temperature sensors, flow meters, level transmitters, control valves with positioners, and junction boxes.
Control System: Local control panel, PLC/RTU, HMI panel, and instrument air supply system.
Process Equipment: Separators, heat exchangers, pumps, compressors, filters, and metering skids.
Structural: Steel base frame, grating, handrails, ladders, and lifting lugs.

Q4: How is a skid-mounted package designed and engineered?

A: The design process typically follows these stages:

Process Design: P&ID development, heat and material balance, hydraulic calculations, and control philosophy.
Mechanical Design: 3D modeling of the skid layout, piping stress analysis, structural steel design, and equipment sizing.
Instrument & Electrical Design: Instrument index, cable schedule, I/O list, control logic, and hazardous area classification.
Fabrication & Assembly: Cutting, welding, NDE, hydrotesting, painting, and final assembly on the skid frame.
Factory Acceptance Test (FAT): Complete functional testing, loop checks, and leak testing before shipment.

Q5: What codes and standards apply to skid-mounted packages?

A: Skid packages must comply with multiple international codes depending on the application and destination country:

Piping: ASME B31.3 (Process Piping), ASME B31.1 (Power Piping).
Pressure Vessels: ASME Section VIII Div. 1, PED 2014/68/EU (Europe).
Structural Steel: AISC 360, EN 1090 (Europe).
Electrical & Instrumentation: IEC 60079 (Explosion Protection), NEC/IECEx for hazardous area classification.
Lifting & Transport: EN 12079 (Offshore Containers), ASME BTH-1 (Lifting Design).
Welding: ASME Section IX, ISO 15614, AWS D1.1.

Q6: What are the transportation and lifting considerations for skid packages?

A: Proper planning for transport and installation is critical:

Weight & Dimensions: Each skid must be designed within road/rail/sea transport limits. Oversized skids may require special permits, escort vehicles, or barge transport.
Center of Gravity: The skid’s center of gravity must be calculated and clearly marked. Lifting lugs must be positioned to ensure balanced lifting without tilting.
Lifting Plan: A detailed lifting plan must be prepared, specifying crane capacity, rigging configuration, wind speed limits, and exclusion zones.
Sea Fastening: For offshore or overseas shipments, the skid must be secured with welded sea fasteners or bolted restraints designed for marine transport accelerations.

Q7: What site preparation and commissioning steps are required after skid delivery?

A: After the skid arrives on site, the following steps are typically required:

Foundation Verification: Confirm that the concrete foundation or steel support structure matches the skid’s footprint, anchor bolt pattern, and elevation.
Setting & Leveling: Place the skid on the foundation, shim as needed, and verify levelness within specified tolerances (typically ±2 mm).
Utility Connections: Connect power supply, instrument air, cooling water, drain, and vent lines to the skid’s interface points.
Process Piping Tie-In: Connect the skid’s inlet and outlet piping to the main process piping system.
Pre-Commissioning: Flush piping, verify instrument calibration, check valve stroke and direction, and perform loop checks.
Commissioning & Start-Up: Introduce process media gradually, verify control system response, and tune control loops.
Site Acceptance Test (SAT): Final performance verification against the guaranteed process parameters before handover to the client.

Q8: What maintenance advantages do skid-mounted packages offer?

A: Skid-mounted packages simplify maintenance in several ways:

Accessibility: All equipment is mounted at ergonomic heights on an open frame, eliminating the need for scaffolding in most cases.
Modular Replacement: If a component fails, the entire sub-skid or cartridge can be unbolted, lifted out, and replaced with a spare — minimizing downtime.
Documentation: Each skid comes with a complete documentation package (as-built drawings, material certificates, test reports, spare parts list), making future maintenance planning straightforward.
Condition Monitoring: Modern skids can be equipped with vibration sensors, corrosion probes, and remote monitoring systems for predictive maintenance.

Our Certificates

Project Cases

YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation
YOSUN Automation

Get a Quote

    ✕

    Get a Quote